Quality control & inspections
Inspection work can be matched to the project stage, product risk and budget. It can be performed at the Dongguan office or directly at the factory.
Sample inspection at Dongguan office
The factory sends samples or small batches to the Foss Global office in Dongguan. Parts are checked with available tools, documented, and shipped onward from Dongguan when agreed.
- Good for samples, first articles and small batches
- Useful when a factory visit is not necessary
- Inspection report with photos, measurements and findings
- Can include repacking and shipment from Dongguan
Factory inspection verification
Foss Global visits the factory and verifies the factory's own inspection results, tools, measurement method and production records.
- Good when the factory already has inspection routines
- Checks whether reported data is reliable
- Reviews measurement method, tools and sample selection
- Can be combined with process review or release check
Factory full inspection
Foss Global goes to the factory and performs the inspection directly. This can be done during running production or as a final release inspection before shipment.
- Good for higher-risk products or new factories
- Can check running production and finished goods
- Can include dimensional, visual, packaging and documentation checks
- Supports release decision before goods are shipped
Inspection planning
- Define sample size and acceptance criteria
- Identify critical dimensions and appearance requirements
- Confirm required tools, gauges, references and drawings
- Agree whether the result is advisory or a release gate
Inspection report
- Photos of inspected parts and defects
- Measurement results where relevant
- Clear pass/fail/conditional release recommendation
- List of open issues and required factory actions
Agree what must be checked and what drawing, sample or requirement applies.
Confirm drawings, samples, gauges, measuring tools, packaging specs and acceptance limits.
Check parts, record findings and photograph important details or defects.
Separate critical defects from minor issues and identify whether factory action is needed.
Recommend release, conditional release, rework, sorting, replacement or further investigation.